Lane Closures in River North

water main closure

Upcoming Construction Closures at 228 E. Ontario
 
Upcoming closures are required at 228 E. Ontario to erect a tower crane; the work will occur in two phases:

Phase Two: Friday, January 8, through Tuesday, January 12, 2016

  • A No Parking/Tow Zone will be in effect, on Ontario, from Fairbanks to St. Clair, during these days
  • A full closure of Ontario, from Fairbanks to St. Clair, will be in effect, Friday, January 8, through Sunday, January 10. During this closure, all vehicles from 230 E. Ontario will be able to enter and exit the building from the east, with assistance from construction personnel.
  • Pedestrian traffic will be maintained; however, pedestrians will be re-routed to the south side of the street at 228 E. Ontario.
  • Monday, January 11 through Tuesday, January 12, portions of the north lane of East Ontario will be closed; traffic control will be in place and this work will not impact 230 E. Ontario.
Please note that Phase Two work is weather dependent and is subject to change.