The Chicago Department of Transportation (CDOT) began emergency repair work on the State Street Bascule Bridge over the main branch of the Chicago River this morning. The work requires a full closure of the bridge to all vehicular and pedestrian traffic through mid-November.
The scope of work involves removing and replacing floor beams and rehabilitating multiple center lock components. There will be additional viaduct repairs north of the bridge.