Grand Avenue Bridge – Emergency Repair

The Chicago Department of Transportation (CDOT) is going to complete emergency repairs to the Grand Avenue Bridge over the Chicago River.

Construction will begin on Monday, October 13th and be completed on Friday, October 24th.
Here are important highlights during construction:

• The bridge will be closed daily from 8 a.m. to 4 p.m.
• The north sidewalk will be closed.
• Lanes will be shifted to the south side of the bridge.
• Traffic will be maintained in each direction.

Image credit: Chicago Department of Transportation